Warning: substr() expects parameter 1 to be string, array given in E:\HOME_PAGE_ROOT\EOT\OT_03mak_view.php on line 62

Warning: substr() expects parameter 1 to be string, array given in E:\HOME_PAGE_ROOT\EOT\OT_03mak_view.php on line 62

Warning: substr() expects parameter 1 to be string, array given in E:\HOME_PAGE_ROOT\EOT\OT_03mak_view.php on line 62
Skip to main menuSkip to content
People Who Lead the future of Ocean

By Manufacturer

All
Product
Sediment Coring Systems
Manufacturer
Mooring Systems Inc.
Group
Research vessel and so on > Others
Related
Research vessel and so on
Catalogue
coring.pdf
ZLS corp PHOTO
Gravity sediment coring valve
-For gravity coring operations, the end of the deployment cable is attached to the top of the main body and lowered as fast as possible when approaching the bottom to allow gravity and inertia to drive the corer barrel into the sediment.
-A check valve P/N 2171VR is installed into the top end of the corer main body that simply allows water to flow through the liner during descent and blocks water during assent. This keeps the water from flushing out the collected sample.
ZLS corp Catalogue